Building C · Artesian Football Complex

MSD of Martinsville High School, 1360 E. Gray St., Martinsville, Indiana · For GM Development · Built by GT Investments, LLC · Plans by D B Tarr and Company

Renderings

Aerial from the southwest: the new 80' × 170' locker room building, with the re-skinned softball locker room in front
Aerial from the northeast, toward the softball field
Eye level from the south lawn
Eye level from the north (restroom side), with the asphalt drive
Interior cutaway with the roof and ceilings off
Top view of the site: walks, parking, fence and the Artesian Well

Interactive 3D model

The model is built from the final-plans IFC (2026), plus the site sheets A703–A706 and X10, laid on Indiana lidar ground and aerial imagery. Drag to orbit, and pinch or scroll to zoom. The side panel has finishes, layers, Foundation, Exterior concrete, rooms, interior/MEP/site views and walk mode. Click a part to see its product info. Right-click or long-press a part to hide it, hide everything of its type, or show all hidden parts. Walls between you and the room fade out automatically; you can turn this off under Display. ASSUMED The plumbing comes from the IFC and is a guide only: what was built is different.

Open the model full screen ? How to use the 3D model

The Building

Size & code

  • New football locker room building, 80' × 170' (13,600 SF), 1 story
  • Existing softball locker room 1,920 SF, re-skinned, with a 64 SF (8' × 8') porch addition
  • Occupancy A-3, construction type V-B
  • Final inspection 8/26/2026, with a partial certificate of occupancy for the new locker room. First home game 8/28/2026.

Shell

  • GPB post-frame shell: 2×6 walls, 80' trusses at 4' o.c., 3.5/12 gable roof
  • G-Rib 40-year 29 ga roof; G10 liner on the walls and ceiling with R38 blown fiberglass
  • 48" brick wainscot by L&L Masonry (Change Order #1) on an 8" CMU brick ledge
  • 8" painted CMU interior walls
  • 6" seamless gutters and one row of snow guards

Rooms (IFC)

100 Corridor, 101 Women's RR, 102 Men's RR, 103 Restroom, 104 Shower, 105 Storage, 106 Vestibule, 107 Coach's Office, 108 Vestibule, 109 Visitor's Locker Room, 111 Mechanical & Electrical, 112 Team Meeting Room, 113 Equipment Storage, 114 Artesian Room, 115 Corridor, 116 Corridor, 117 Janitor, 118 Passage, 119 Artesian Locker Room, 120 Restroom, 121 Shower, 122 Restroom, 123 Official's Room, 124 Football Coach's Office, 125 Break, 126 Lockers, 127 Head Coach Office, 128 Corridor, 129 Storage, 130 Restroom, 130B Chase, 131 Laundry, 132 Training, 133 Chase, 134 Chase, 135 Chase, 136 Chase, 137 Chase

Existing softball building: E101 Locker Room, E102 Storage, E103 Concessions, E104 Office, E105 Mechanical, E106 Storage, E107 Restroom, E108 Coridor, E109 Vestibule, E110 Dugout

Mechanical & plumbing

  • 3 Alpha Aire II DOAS units (8 ton) by AllTrades
  • Radiant heat in the floors (benches can't be anchored more than 1" deep)
  • Culligan Hi-Flo 3e water softener
  • Sloan Regal 111 (1.6 gpf) and Regal 186 (1.0 gpf) flush valves, Oct 2026

Floors

  • Epoxy flake with a polyaspartic top coat (TAK); the showers get ADA curbs
  • Milliken carpet planks in the offices
  • Polished concrete planned over Christmas break 2026, after a test spot in the officials' room

Doors & security

  • Hollow metal doors and frames (CDF) with SFIC hardware (IN Door & Hardware), re-cored by the school to Medeco
  • Keyed removable mullions on the double doors (Change Order #2)
  • APTEK access control on 8 doors, 9 cameras and about 40 network drops

Site

Paving (A704–A706)

  • 4" concrete walks on 2" #11 stone
  • HMA: full-depth, mill and 1.5" resurface, and surface seal with crack repair
  • Stalls 9' o.c., ADA aisles, and a no-parking zone
  • Concrete parking curbs pinned about 24" to center (ASSUMED)

Utilities (X10)

  • 2" gas line lowered (Miller Pipeline for CenterPoint), with a new gas meter
  • Duke electric service; electrical box north of the ticket booth lowered (Live Wire)
  • Fiber handhold and conduit repaired; APTEK/Galaxy One pulled new fiber

Fence & landscape

  • Wrought iron fence and main gates
  • Chain link privacy fence around the HVAC units and the electrical service
  • Artesian Well: two rock tiers with a pump, and alternating red and yellow mums
  • Retention pond in Broyer's scope (pending permits)

The ground is Indiana 2016–2020 lidar (bare earth) with the current IndianaMap aerial, which predates construction. Grading next to the building is ASSUMED (no grading plan on file).

FF&E, finishes & products

Brands, models and colors come from Reed's invoices, the selection manuals, the spec sheets and email. Anything not confirmed is marked ASSUMED.

CategoryItemBrandModel / specColorQtyLocationLinksSource / status
Exterior shellMetal roofGraber Post Buildings (GPB)G-Rib 40 yr 29 ga w/ Therma Guard, 3.5/12 gable, 1 row snow guard per sideColor ASSUMED (contract: "Colors to be determined")80x170 bldgRoofsiteGPB contract #71682 (11/26/2025)
ASSUMED
Exterior shellMetal sidingGraber Post Buildings (GPB)Contract: Board & Batten 10" 26 ga w/ house wrap + 7/16" OSB. IFC wall type: G-RibColor ASSUMEDExterior wallssiteGPB contract #71682; IFC wall types
ASSUMED
Exterior shellInterior liner walls + ceilingGraber Post Buildings (GPB)G10 10 yr 29 ga liner; ceiling liner w/ R38 blown fiberglassWhite ASSUMEDMechanical / non-ACT areassiteGPB contract #71682
ASSUMED
Exterior shellGutters + downspoutsGraber Post Buildings (GPB)6" seamless incl. accessoriesColor ASSUMEDEavesGPB contract #71682; Provided Items
ASSUMED
Exterior shellBrick wainscotL&L Masonry LLC (installer)Brick on perimeter, base flashing/weeps/ties; height raised 40" to 48" (Change Order #1)"Bricks to match existing building" - brick name/color not on filePerimeterNew building baseL&L quote #949 (11/21/2025); Change Order #1 (3/31/26)
Brick name ASSUMED
Exterior shell8" CMU wallsL&L Masonry LLC8" CMU 10-12 ft, rod & cell 6 ft o.c., bond beam, bull nose at doors/cornersPainted (SW ProMar 200)Interior bearing wallsL&L quote #949
Exterior shellAluminum frame windowsASSUMED via GPB/Indy Glass26" x 64" aluminum frame windowColor ASSUMED4Per Change Order #3Change Order #3 (3/31/26)
ASSUMED
DoorsHollow metal doors + framesCDF Distributors18 ga galvannealed polystyrene-core HM doors, Steelcraft hinge prep, 161 lock prep; 16 ga 3-piece knockdown masonry frames; 4-1/2" ball-bearing NRP hinges 26DPainted ASSUMEDPer door scheduleAll doorssiteCDF quotes QB-09435555 / QB-09517142; Martinsville Door Schedule
DoorsDoor hardwareIndiana Door & Hardware Specialties17 cylindrical SFIC locks, 31 closers (8 w/ stop arm), 23 exit devices w/ lever trim, 11 Medeco exterior cylinders, 19 interior cylinders; re-cored by school to MedecoSatin chrome / 26D ASSUMEDsee qtyAll doorsIN Door & Hardware inv. 140696AA (5/21/26) + 5 follow-up invoices
Lock/closer brand ASSUMED
DoorsKeyed removable mullionsCDF Distributors4900X keyed removable mullion set 84" (6 non-rated + 1 fire rated); 3901 rim cylinder 26D x726D7All double doors except #132siteCDF quote 450721; Change Order #2
DoorsAccess control + cameras + networkAPTEK (contract w/ GM Development)Access control 8 doors, 9 cameras (Cat 6 plenum), ~40 network drops, Aruba switch8 doors / 9 camsBuilding CsiteAPTEK quotes #002421 V3, #002495 V1
FlooringEpoxy flake floor + showersTAK Floor CoatingsDiamond grind CSP 2-3, MVB epoxy base, 1/4" full-broadcast flake, polyaspartic top coat, polyurea joint fillFlake: OASIS custom blend4,963 SF + 518 LF jointsRestrooms, showers, locker rooms (X3 plan)siteTAK invoice #75 (6/19/26); X3 Floor Covering 11-20-25
FlooringCarpet tile (planks)MillikenColor Field Patina PAT108 (Dim Stone) + PAT249-52 (Billion)Dim Stone / Billion~1,030 SFOffices (carpet plank on X3 10-21-26)siteWagler Floor & Design inv. 4419 (7/25/26)
FlooringCarpet adhesive + reducerMilliken / SchluterMilliken Non-Reactive Standard Modular Adhesive; Schluter Vinpro-U reducer 9/32"Reducer: brushed nickelCarpet edgessiteWagler inv. 4419
FlooringCove baseJohnsonite (adhesive)4" cove base; Johnsonite 960 wall base adhesiveCharcoal35 LFCarpet roomsWagler inv. 4419
Base brand ASSUMED
FlooringPolished concrete (planned)Contractor TBDMechanical grind + polish; test spot in officials room; rest over Christmas break 2026ClearRooms marked on X3 10-21-26 + north restrooms (Kyle 10/21)Corridors, team roomsMartinsville AFC - Floor Covering 10-21-26; emails 10/1 and 10/21/26
Planned - ASSUMED
FlooringADA shower curbsBrand not on fileADA-compliant rollover shower curb systemAll showersShowersReed emails 8/31 + 10/1/26
ASSUMED
Walls / ceilingsPaintSherwin-WilliamsSW ProMar 200Base: GPB Grey; accents: Positive Red, Duct Blue (SW color numbers not on file)Interior walls (accent locations per X10)siteBuilding C - Final Selections.pdf / Selection Manual 5-29-26
Color numbers ASSUMED
Walls / ceilingsAcoustic ceilingArmstrong (via Brown Brothers Lumber)15/16" drop grid; 24x24 Fissured 949 (general) / Fine Fissured 928 (high moisture)WhiteCeilingssiteBuilding C - Final Selections.pdf / Selection Manual 5-29-26
CaseworkCabinetsCabinets To GoHampton Pewter shaker: 13 BC36, 4 BC30, 2 DC318, 3 DC324, 5 SB36, 4 LC1884 pantry, 12 WC3630, 5 WC3618, 4 WC3030, 3 WC2430, 2 WC1830 + fillers/toe kick/scribeHampton Pewter57 boxesBreak, team meeting, training, equipment, laundry, coach, officialssiteCabinets To Go SO92422268 (6/11/26)
CaseworkCountertopsStoll Bros. LumberLivingStone solid surface w/ 4" backsplash, field measured + installed; WB24-BLK brackets x4 prCountertop color not on order - ASSUMEDArtisan, break, team meeting, training, equipment, laundry, coach, officialsStoll Bros 2606-C28955 + 2607-C30284 (lowering)
ASSUMED
CaseworkCabinet knobsBrown Brothers Lumber1-3/16" diameter knobSatin nickelCabinetsBuilding C - Final Selections.pdf / Selection Manual 5-29-26
Toilet accessoriesToilet partitionsMcMaster-Carr (ordered via GPB)1" solid plasticDark Blue recommended (match softball locker room) - ASSUMEDRestroomssiteBuilding C - Final Selections.pdf / Selection Manual 5-29-26; Allowance sheet (Div 10)
ASSUMED
Toilet accessoriesMirrorBobrickB-165-1824Stainless18RestroomssiteMartinsville - Bathroom Items; Selection Manual
Toilet accessoriesBaby changing stationASI (installed); Koala Kare KB300-01 was selectedASI 9012 surface-mounted plasticGrey ASSUMED2Public restroomssite · manualTotal Restroom TR-303115856; Selection Manual
Model mismatch - ASSUMED
Toilet accessoriesShower seatsBobrickB-5181 reversible folding shower seat (L x3, R x7)Phenolic10ADA showerssiteTotal Restroom TR-303115856; Bathroom Items
Toilet accessoriesDressing seatBobrickB-51911ADA dressingsiteBathroom Items list
Supplier ASSUMED
Toilet accessoriesSanitary napkin disposalBobrickB-270 surface-mountedStainless7Women / unisexsiteTotal Restroom TR-303115856
Toilet accessoriesWaste receptacleBobrickB-367-60 12 gal surface-mountedStainless13RestroomssiteTotal Restroom TR-303115856
Toilet accessoriesToilet tissue dispenserScott Essential (Kimberly-Clark)Coreless twin jumbo roll KCC09608Black15ToiletssiteTotal Restroom TR-303115856
Toilet accessoriesPaper towel dispenserScott Essential (Kimberly-Clark)Manual hard roll towel dispenser (KCC46253 per selection)Black ASSUMED13RestroomssiteTotal Restroom TR-303115856; Bathroom Items
Toilet accessoriesSoap dispenserScott EssentialsManual liquid hand soap dispenser (92145)12LavatoriessiteBathroom Items sheet 2 / Selection Manual
Supplier ASSUMED
Toilet accessoriesGrab barsJones Stephens1-1/2" satin concealed flange: G13118 (18") x32, G13130 (30") x10, G13136 (36") x14, G13142 (42") x14Satin stainless70ADA toilets / showerssiteGrabbars.com GB-32729, GB-33177, GB-33827, GB-34320
PlumbingWater closetsAmerican StandardMadera FloWise 16-1/2" elongated flushometer bowl (3043.001.020)Whiteper planRestroomssite · manualSpecs folder; Brook Plumbing + Josh Specs
PlumbingToilet flush valves (as built)SloanRegal 111, 1.6 gpf (replaced the 1.28 gpf sensor valves, Oct 2026)Chromeall WCsRestroomssiteReed "Plumbing Issues - AFC" 10/5/26
PlumbingUrinal flush valves (as built)SloanRegal 186, 1.0 gpfChromeall urinalsRestroomssiteReed 10/5/26
PlumbingUrinalsAmerican Standard (Allbrook 6550.001) or UT447E per AllTrades specWashout urinalWhiteper planRestroomssite · manualBrook Plumbing vs Josh Specs (two different spec sets)
ASSUMED
PlumbingLavatoriesAmerican Standard Lucerne 0355.012 or Zurn Z5340 (AllTrades spec)20" x 18" wall-hung vitreous chinaWhiteper planRestroomsmanualBrook Plumbing vs Josh Specs
ASSUMED
PlumbingLavatory faucetsProFlo PFWSC3007 (AllTrades) or American Standard Chancellor 7022.201Single handle 1.2 gpmChromeper planLavatoriessiteJosh Specs / Brook Plumbing
ASSUMED
PlumbingShower valves / headsOlympia TD-2372-ADA i2 (ADA handheld) / American Standard TU662SG kitSingle handle shower trim w/ handheldChromeper planShowersmanualJosh Specs / Brook Plumbing
ASSUMED
PlumbingDouble bowl sinksCompass Manufacturing003-513 33x22x6" double bowlStainlessper planBreak / trainingSpecs/Double Bowl Sinks
ASSUMED
PlumbingUtility sink + wall faucetAmerican Standard Raleigh SS sink kit 20SB.332211C; B&K 123-009NL 8" wall mount faucetStainless / chromeTraining / laundryBrook Plumbing
ASSUMED
PlumbingWater softenerCulliganHi-Flo 3e HCE-300-3 w/ hard water bypass; 30x50 brine tank, 3/4" valve; 3/4" vacuum breaker; 3" SS NPT flow meter1Mechanicalsite · manualCulligan inv. 6489609 (5/27/26)
PlumbingBoiler / water heatingNavienNFC-175 (from IFC)per IFCMechanicalsiteIFC only (plumbing in IFC is not as built)
ASSUMED
HVACDOAS unitsAlpha Aire (by AllTrade Heating and Air)Alpha Aire II DOAS, VAV air-source heat pump w/ energy recovery, 8 ton3Mechanical + home locker roommanualAllTrades DOAS invoice; Reed emails 8/17 + 9/8/26
HVACOther HVACTrane / Greenheck (IFC)Trane 5 ton; Greenheck IDBHper IFCIFC families
ASSUMED
HVACDryer exhaust upgrade (proposed)Dryer supplier (name not on file)Industrial lint trap 8" to 12" + 1.5 HP inline blower1LaundryReed "Martinsville Dryer" 10/20/26
Pending approval
ElectricalExterior LED wall packsBy AllTrade Heating and AirLED wall packs (5 added: 2 south, 3 north) + emergency lighting at exits5+ExteriorReed emails 8/27 + 10/1/26
Fixture model not on file
FF&ELocker room clocksNevcoLocker room clocks (installer Andy)4Both locker rooms, coach office, officialssiteNevco Locker Room Clocks thread 7/29-8/24/26
Model ASSUMED
FF&ETVsNot on file60" flat screen wall mount (IFC); locker TVs mirror one PCper IFCLocker rooms, coaches roomIFC; Will Miers 8/31/26
ASSUMED
FF&EIce machineManitowociP0450 half-dice/dice cube machine (IDP0450A ASSUMED)1Training 132site · manualIce Machine Specs - 132 Training
ASSUMED
FF&EReach-in refrigeratorEverest Refrigeration (ASSUMED brand)EGSDH2 glass/solid half-door dual tempStainless1Training 132manualRefrigerator Specs - 132 Training
ASSUMED
FF&EWall graphicsDG Graphics (Martinsville)Vinyl wall wrap + window perf on door glassSchool colorsHallway north of locker room, doorsDG Graphics thread 7/21-8/24/26
FF&EWasher / dryerNot on fileCommercial washer + dryerLaundryKyle 8/31/26
ASSUMED
FF&EBenches (visitor locker)Lee CompanyPortable anchorless pedestal benchesVisitor locker roomReed 9/14/26
Model ASSUMED
FF&EFire extinguishers + cabinetsExtinguisher Pro (owner)Per Building C fire extinguisher planPer planFootball Locker room thread 9/1/26
By owner
SiteWrought iron fence + gatesBroyer Construction (installer)Ornamental (wrought iron) fence, main gatesBlack ASSUMEDSite perimeterReed emails 8/19, 9/8, 10/12/26
Manufacturer ASSUMED
SiteChain link privacy fenceK W Fence (Earl Wagler)Chain link around HVAC units + electrical serviceGalvanized ASSUMEDHVAC + electricalReed "Fw: invoice" 10/20/26
SiteConcrete parking curbsBroyer ConstructionPrecast wheel stops, pinned, ~24" to center from walk (Kyle)Concreteall stallsParkingAFC Floors thread 10/8-10/15/26
Spacing ASSUMED
SiteArtesian Well + mumsBroyer / landscape crewTwo-tier rock well, bucket + landscape pump; alternating red & yellow mumsRed / yellowSouth lawnUpdate from the AFC thread 9/2-9/8/26

Warranties

ItemWarrantorTermStartRegistrationDocument
Building C work (general 1-yr correction)GT Investments, LLC1 year correction period after Substantial Completion; all other warranties issued in Owner name2026-08-26 ASSUMEDn/aAIA A104 Contract (Owner GM Development) §9.4, §18.2
Metal roof panelsGraber Post Buildings (manufacturer)40 year (G-Rib 40 Yr 29 ga)2026-08 ASSUMEDNot on file - ask GPBGPB contract #71682
Wainscot / liner panelsGraber Post Buildings10 year (G10 10 Yr 29 ga)2026-08 ASSUMEDNot on fileGPB contract #71682
GPB building workmanshipGraber Post Buildings, Inc.Limited: correct deficiencies; claims within 1 year of Substantial Completion2026-08-26 ASSUMEDn/aGPB contract #71682 §17, §28
Access control, cameras, networkAPTEK1 year hardware + labor from installationInstall date not on filen/aAPTEK quotes #002421 / #002495
Baby changing stationKoala Kare (if KB300) / ASI (installed 9012)KB300: 5 year limited incl. vandalism; ASI 9012 term not on file2026-06/07 delivery ASSUMEDNot on fileKoala Kare KB300 spec sheet (installed unit is ASI 9012 - ASSUMED)
Water softenerCulliganManufacturer warranty - term not on file2026-05-27 ASSUMEDNot on fileCulligan inv. 6489609; Hi-Flo 3e IOM
DOAS unitsAlpha Aire / AllTrade Heating and AirTerm not on fileStartup 2026-09 ASSUMEDNot on fileAsk AllTrades
MEP installationAllTrade Heating and AirTerm not on file (assume 1 yr per prime contract)2026-08-26 ASSUMEDn/aAllTrades proposal #101 (no warranty clause)
Epoxy flake floorsTAK Floor CoatingsTerm not on file (sticky floor in officials RR under review 10/2026)2026-06-19 ASSUMEDn/aTAK invoice #75
Carpet tileMillikenManufacturer warranty - term not on file2026-07-25 ASSUMEDNot on fileWagler inv. 4419
Flush valvesSloanManufacturer warranty - term not on file2026-10 (replacement) ASSUMEDNot on fileReed 10/5/26
SignageSign manufacturer (spec)5 years from Substantial Completion (Div 10 spec)2026-08-26 ASSUMEDn/aBuilding C Div 10 spec §1.6 (signs by owner/Sign Solutions - ASSUMED)
MasonryL&L Masonry LLCTerm not on file (1 yr ASSUMED)2026-08 ASSUMEDn/aNo warranty language in L&L quote
Site work / fence / pavingBroyer ConstructionTerm not on file; fence "as provided by manufacturer" (Div 32)2026-10 ASSUMEDn/aBuilding C Div 32 spec; Broyer contracts

Subcontractors & suppliers

CompanyTradeContact
GT Investments, LLC (Brook / Reed Tarr)General contractorReed Tarr, reed@dbtarr.com; Brook Tarr, brook@dbtarr.com; 812-278-0060
D B Tarr and CompanyArchitect / plans8728 W Co Rd 175 S, French Lick IN; dbtarr@yahoo.com; 812-278-0060
GM Development Companies LLCOwner rep / developer (contract owner)Greg Martz, greg@gm-development.com, 317-417-5094
Graber Post Buildings, Inc. (GPB)Building shell, metal roof/siding/trim, toilet partitions orderDarrell Wittmer, 812-636-7355, graberpost.com
L&L Masonry LLCCMU walls, brick wainscotLamar Fox, LLMasonryllc@gmail.com, 317-512-8908
AllTrade Heating and AirElectrical, mechanical, plumbing, DOASJosh (sales); Jacque Kendle, admin@alltradeheatingandair.net, 812-789-3065
Broyer Construction (Jack Broyer)Site demo, utilities, concrete, asphalt, fence, landscaping, retention pondJack Broyer (contact details not in sources)
W & W Poured Walls, Inc.Concrete cut + pour back (interior)Sheldon Graber, sheldon@wwpouredwalls.com, 812-787-0180
TAK Floor CoatingsEpoxy flake floorssales@takcoatings.com, 317-300-5017
Wagler Floor & DesignCarpet tile + cove baseMatt Wagler, Matt@waglerfloor.com, 812-257-0700
Matthew KneppBlock showers (softball locker room)mattslk@upwardmail.com
K W Fence (Earl Wagler)Chain link privacy fencingkwfence1@gmail.com
K and K Fence CoTemporary fence panels (supply)Kevin Banholzer, kbanholzer@kandkfence.com, 317-759-5891
Culligan Martinsville / Culligan UltrapureWater softener supply + installJason Alexander, 317-441-9242; 765-349-5351
Stoll Bros. LumberSolid surface countertops (measure + install)812-636-4053
Cabinets To Go (Indianapolis)CabinetsTimothy Casteel, 317-608-0165
Indiana Door & Hardware SpecialtiesDoor hardware812-336-0813
CDF DistributorsHM doors, frames, mullionscdfdistributors.com
Total RestroomToilet accessories supplytotalrestroom.com
Grabbars.comGrab bars supplygrabbars.com
APTEKAccess control, cameras, networking (GM Development contract)Damir Husejnovic, DamirH@aptek-ssc.com, 317-643-2726
Galaxy OneLow voltage / fiberJames Meade, james.meade@galaxyone.us
Live WireLower electrical box N of ticket boothContact not in sources
Miller Pipeline (for CenterPoint)Lower 2" gas line, new gas serviceContact not in sources
DG GraphicsWall graphics + window perfMatt Long, matt@dggraphicsindy.com, 765-349-9500
Nevco (installer Andy)Locker room clocksContact not in sources
HilarioExtra cleaningContact not in sources
Lee CompanyVisitor locker room benches (per Reed 9/14/26)Samantha Broach (billing), sbroach@leecompanyinc.com, 812-235-8155
Extinguisher ProFire extinguishers (owner contract)Via Kyle Stout
Sign Solutions (Indianapolis)Signage (owner)Via Kyle Stout - ASSUMED

Assumptions

Open questions for Reed

  1. Exterior colors: the GPB contract says "Colors to be determined". What are the actual roof, siding, trim, gutter and door colors?
  2. Brick: which brick (maker, name, color) did L&L Masonry use to "match existing building"?
  3. Siding profile: the GPB contract lists 10" Board & Batten but the IFC wall type is G-Rib. Which was installed?
  4. Plumbing fixtures: there are two spec sets (American Standard in "Brook Plumbing" vs AllTrades "Josh Specs": UT447E urinal, Zurn Z5340 lav, ProFlo faucet, Olympia ADA shower). Which were installed?
  5. Paint: the SW color numbers for "GPB Grey", "Positive Red" and "Duct Blue", and where the accent walls are.
  6. Countertops: which LivingStone solid-surface color? Partitions: was Dark Blue final?
  7. Baby changing stations: ASI 9012 was shipped, but Koala Kare KB300-01 was selected. Which is on the wall?
  8. Warranties: GPB roof/panel registration, Culligan, Alpha Aire DOAS, Sloan, Milliken, TAK and AllTrades workmanship terms and documents. Is 8/26/2026 the Substantial Completion / warranty start date?
  9. Polished concrete: who is the flooring contractor, and what is the final room list (plus the north restrooms Kyle asked for)?
  10. Dryer exhaust upgrade (lint trap + blower): approved? Who supplies the dryer and washer (make and model)?
  11. Wrought iron fence and gates: manufacturer, model and color? Was the parking curb spacing confirmed at 24" to center?
  12. Exterior LED wall packs and emergency lights: fixture make and model (Kyle asked for exterior-rated specs)?
  13. Nevco clock model, TV make and model, and the fire extinguisher cabinet type?
  14. Broyer, Live Wire, Miller Pipeline, Nevco and Hilario contact details for the subcontractor list.
  15. Retention pond: permitted and scheduled? (in Jack's scope)