MSD of Martinsville High School, 1360 E. Gray St., Martinsville, Indiana · For GM Development · Built by GT Investments, LLC · Plans by D B Tarr and Company






The model is built from the final-plans IFC (2026), plus the site sheets A703–A706 and X10, laid on Indiana lidar ground and aerial imagery. Drag to orbit, and pinch or scroll to zoom. The side panel has finishes, layers, Foundation, Exterior concrete, rooms, interior/MEP/site views and walk mode. Click a part to see its product info. Right-click or long-press a part to hide it, hide everything of its type, or show all hidden parts. Walls between you and the room fade out automatically; you can turn this off under Display. ASSUMED The plumbing comes from the IFC and is a guide only: what was built is different.
Open the model full screen ? How to use the 3D model100 Corridor, 101 Women's RR, 102 Men's RR, 103 Restroom, 104 Shower, 105 Storage, 106 Vestibule, 107 Coach's Office, 108 Vestibule, 109 Visitor's Locker Room, 111 Mechanical & Electrical, 112 Team Meeting Room, 113 Equipment Storage, 114 Artesian Room, 115 Corridor, 116 Corridor, 117 Janitor, 118 Passage, 119 Artesian Locker Room, 120 Restroom, 121 Shower, 122 Restroom, 123 Official's Room, 124 Football Coach's Office, 125 Break, 126 Lockers, 127 Head Coach Office, 128 Corridor, 129 Storage, 130 Restroom, 130B Chase, 131 Laundry, 132 Training, 133 Chase, 134 Chase, 135 Chase, 136 Chase, 137 Chase
Existing softball building: E101 Locker Room, E102 Storage, E103 Concessions, E104 Office, E105 Mechanical, E106 Storage, E107 Restroom, E108 Coridor, E109 Vestibule, E110 Dugout
The ground is Indiana 2016–2020 lidar (bare earth) with the current IndianaMap aerial, which predates construction. Grading next to the building is ASSUMED (no grading plan on file).
Brands, models and colors come from Reed's invoices, the selection manuals, the spec sheets and email. Anything not confirmed is marked ASSUMED.
| Category | Item | Brand | Model / spec | Color | Qty | Location | Links | Source / status |
|---|---|---|---|---|---|---|---|---|
| Exterior shell | Metal roof | Graber Post Buildings (GPB) | G-Rib 40 yr 29 ga w/ Therma Guard, 3.5/12 gable, 1 row snow guard per side | Color ASSUMED (contract: "Colors to be determined") | 80x170 bldg | Roof | site | GPB contract #71682 (11/26/2025) ASSUMED |
| Exterior shell | Metal siding | Graber Post Buildings (GPB) | Contract: Board & Batten 10" 26 ga w/ house wrap + 7/16" OSB. IFC wall type: G-Rib | Color ASSUMED | Exterior walls | site | GPB contract #71682; IFC wall types ASSUMED | |
| Exterior shell | Interior liner walls + ceiling | Graber Post Buildings (GPB) | G10 10 yr 29 ga liner; ceiling liner w/ R38 blown fiberglass | White ASSUMED | Mechanical / non-ACT areas | site | GPB contract #71682 ASSUMED | |
| Exterior shell | Gutters + downspouts | Graber Post Buildings (GPB) | 6" seamless incl. accessories | Color ASSUMED | Eaves | GPB contract #71682; Provided Items ASSUMED | ||
| Exterior shell | Brick wainscot | L&L Masonry LLC (installer) | Brick on perimeter, base flashing/weeps/ties; height raised 40" to 48" (Change Order #1) | "Bricks to match existing building" - brick name/color not on file | Perimeter | New building base | L&L quote #949 (11/21/2025); Change Order #1 (3/31/26) Brick name ASSUMED | |
| Exterior shell | 8" CMU walls | L&L Masonry LLC | 8" CMU 10-12 ft, rod & cell 6 ft o.c., bond beam, bull nose at doors/corners | Painted (SW ProMar 200) | Interior bearing walls | L&L quote #949 | ||
| Exterior shell | Aluminum frame windows | ASSUMED via GPB/Indy Glass | 26" x 64" aluminum frame window | Color ASSUMED | 4 | Per Change Order #3 | Change Order #3 (3/31/26) ASSUMED | |
| Doors | Hollow metal doors + frames | CDF Distributors | 18 ga galvannealed polystyrene-core HM doors, Steelcraft hinge prep, 161 lock prep; 16 ga 3-piece knockdown masonry frames; 4-1/2" ball-bearing NRP hinges 26D | Painted ASSUMED | Per door schedule | All doors | site | CDF quotes QB-09435555 / QB-09517142; Martinsville Door Schedule |
| Doors | Door hardware | Indiana Door & Hardware Specialties | 17 cylindrical SFIC locks, 31 closers (8 w/ stop arm), 23 exit devices w/ lever trim, 11 Medeco exterior cylinders, 19 interior cylinders; re-cored by school to Medeco | Satin chrome / 26D ASSUMED | see qty | All doors | IN Door & Hardware inv. 140696AA (5/21/26) + 5 follow-up invoices Lock/closer brand ASSUMED | |
| Doors | Keyed removable mullions | CDF Distributors | 4900X keyed removable mullion set 84" (6 non-rated + 1 fire rated); 3901 rim cylinder 26D x7 | 26D | 7 | All double doors except #132 | site | CDF quote 450721; Change Order #2 |
| Doors | Access control + cameras + network | APTEK (contract w/ GM Development) | Access control 8 doors, 9 cameras (Cat 6 plenum), ~40 network drops, Aruba switch | 8 doors / 9 cams | Building C | site | APTEK quotes #002421 V3, #002495 V1 | |
| Flooring | Epoxy flake floor + showers | TAK Floor Coatings | Diamond grind CSP 2-3, MVB epoxy base, 1/4" full-broadcast flake, polyaspartic top coat, polyurea joint fill | Flake: OASIS custom blend | 4,963 SF + 518 LF joints | Restrooms, showers, locker rooms (X3 plan) | site | TAK invoice #75 (6/19/26); X3 Floor Covering 11-20-25 |
| Flooring | Carpet tile (planks) | Milliken | Color Field Patina PAT108 (Dim Stone) + PAT249-52 (Billion) | Dim Stone / Billion | ~1,030 SF | Offices (carpet plank on X3 10-21-26) | site | Wagler Floor & Design inv. 4419 (7/25/26) |
| Flooring | Carpet adhesive + reducer | Milliken / Schluter | Milliken Non-Reactive Standard Modular Adhesive; Schluter Vinpro-U reducer 9/32" | Reducer: brushed nickel | Carpet edges | site | Wagler inv. 4419 | |
| Flooring | Cove base | Johnsonite (adhesive) | 4" cove base; Johnsonite 960 wall base adhesive | Charcoal | 35 LF | Carpet rooms | Wagler inv. 4419 Base brand ASSUMED | |
| Flooring | Polished concrete (planned) | Contractor TBD | Mechanical grind + polish; test spot in officials room; rest over Christmas break 2026 | Clear | Rooms marked on X3 10-21-26 + north restrooms (Kyle 10/21) | Corridors, team rooms | Martinsville AFC - Floor Covering 10-21-26; emails 10/1 and 10/21/26 Planned - ASSUMED | |
| Flooring | ADA shower curbs | Brand not on file | ADA-compliant rollover shower curb system | All showers | Showers | Reed emails 8/31 + 10/1/26 ASSUMED | ||
| Walls / ceilings | Paint | Sherwin-Williams | SW ProMar 200 | Base: GPB Grey; accents: Positive Red, Duct Blue (SW color numbers not on file) | Interior walls (accent locations per X10) | site | Building C - Final Selections.pdf / Selection Manual 5-29-26 Color numbers ASSUMED | |
| Walls / ceilings | Acoustic ceiling | Armstrong (via Brown Brothers Lumber) | 15/16" drop grid; 24x24 Fissured 949 (general) / Fine Fissured 928 (high moisture) | White | Ceilings | site | Building C - Final Selections.pdf / Selection Manual 5-29-26 | |
| Casework | Cabinets | Cabinets To Go | Hampton Pewter shaker: 13 BC36, 4 BC30, 2 DC318, 3 DC324, 5 SB36, 4 LC1884 pantry, 12 WC3630, 5 WC3618, 4 WC3030, 3 WC2430, 2 WC1830 + fillers/toe kick/scribe | Hampton Pewter | 57 boxes | Break, team meeting, training, equipment, laundry, coach, officials | site | Cabinets To Go SO92422268 (6/11/26) |
| Casework | Countertops | Stoll Bros. Lumber | LivingStone solid surface w/ 4" backsplash, field measured + installed; WB24-BLK brackets x4 pr | Countertop color not on order - ASSUMED | Artisan, break, team meeting, training, equipment, laundry, coach, officials | Stoll Bros 2606-C28955 + 2607-C30284 (lowering) ASSUMED | ||
| Casework | Cabinet knobs | Brown Brothers Lumber | 1-3/16" diameter knob | Satin nickel | Cabinets | Building C - Final Selections.pdf / Selection Manual 5-29-26 | ||
| Toilet accessories | Toilet partitions | McMaster-Carr (ordered via GPB) | 1" solid plastic | Dark Blue recommended (match softball locker room) - ASSUMED | Restrooms | site | Building C - Final Selections.pdf / Selection Manual 5-29-26; Allowance sheet (Div 10) ASSUMED | |
| Toilet accessories | Mirror | Bobrick | B-165-1824 | Stainless | 18 | Restrooms | site | Martinsville - Bathroom Items; Selection Manual |
| Toilet accessories | Baby changing station | ASI (installed); Koala Kare KB300-01 was selected | ASI 9012 surface-mounted plastic | Grey ASSUMED | 2 | Public restrooms | site · manual | Total Restroom TR-303115856; Selection Manual Model mismatch - ASSUMED |
| Toilet accessories | Shower seats | Bobrick | B-5181 reversible folding shower seat (L x3, R x7) | Phenolic | 10 | ADA showers | site | Total Restroom TR-303115856; Bathroom Items |
| Toilet accessories | Dressing seat | Bobrick | B-5191 | 1 | ADA dressing | site | Bathroom Items list Supplier ASSUMED | |
| Toilet accessories | Sanitary napkin disposal | Bobrick | B-270 surface-mounted | Stainless | 7 | Women / unisex | site | Total Restroom TR-303115856 |
| Toilet accessories | Waste receptacle | Bobrick | B-367-60 12 gal surface-mounted | Stainless | 13 | Restrooms | site | Total Restroom TR-303115856 |
| Toilet accessories | Toilet tissue dispenser | Scott Essential (Kimberly-Clark) | Coreless twin jumbo roll KCC09608 | Black | 15 | Toilets | site | Total Restroom TR-303115856 |
| Toilet accessories | Paper towel dispenser | Scott Essential (Kimberly-Clark) | Manual hard roll towel dispenser (KCC46253 per selection) | Black ASSUMED | 13 | Restrooms | site | Total Restroom TR-303115856; Bathroom Items |
| Toilet accessories | Soap dispenser | Scott Essentials | Manual liquid hand soap dispenser (92145) | 12 | Lavatories | site | Bathroom Items sheet 2 / Selection Manual Supplier ASSUMED | |
| Toilet accessories | Grab bars | Jones Stephens | 1-1/2" satin concealed flange: G13118 (18") x32, G13130 (30") x10, G13136 (36") x14, G13142 (42") x14 | Satin stainless | 70 | ADA toilets / showers | site | Grabbars.com GB-32729, GB-33177, GB-33827, GB-34320 |
| Plumbing | Water closets | American Standard | Madera FloWise 16-1/2" elongated flushometer bowl (3043.001.020) | White | per plan | Restrooms | site · manual | Specs folder; Brook Plumbing + Josh Specs |
| Plumbing | Toilet flush valves (as built) | Sloan | Regal 111, 1.6 gpf (replaced the 1.28 gpf sensor valves, Oct 2026) | Chrome | all WCs | Restrooms | site | Reed "Plumbing Issues - AFC" 10/5/26 |
| Plumbing | Urinal flush valves (as built) | Sloan | Regal 186, 1.0 gpf | Chrome | all urinals | Restrooms | site | Reed 10/5/26 |
| Plumbing | Urinals | American Standard (Allbrook 6550.001) or UT447E per AllTrades spec | Washout urinal | White | per plan | Restrooms | site · manual | Brook Plumbing vs Josh Specs (two different spec sets) ASSUMED |
| Plumbing | Lavatories | American Standard Lucerne 0355.012 or Zurn Z5340 (AllTrades spec) | 20" x 18" wall-hung vitreous china | White | per plan | Restrooms | manual | Brook Plumbing vs Josh Specs ASSUMED |
| Plumbing | Lavatory faucets | ProFlo PFWSC3007 (AllTrades) or American Standard Chancellor 7022.201 | Single handle 1.2 gpm | Chrome | per plan | Lavatories | site | Josh Specs / Brook Plumbing ASSUMED |
| Plumbing | Shower valves / heads | Olympia TD-2372-ADA i2 (ADA handheld) / American Standard TU662SG kit | Single handle shower trim w/ handheld | Chrome | per plan | Showers | manual | Josh Specs / Brook Plumbing ASSUMED |
| Plumbing | Double bowl sinks | Compass Manufacturing | 003-513 33x22x6" double bowl | Stainless | per plan | Break / training | Specs/Double Bowl Sinks ASSUMED | |
| Plumbing | Utility sink + wall faucet | American Standard Raleigh SS sink kit 20SB.332211C; B&K 123-009NL 8" wall mount faucet | Stainless / chrome | Training / laundry | Brook Plumbing ASSUMED | |||
| Plumbing | Water softener | Culligan | Hi-Flo 3e HCE-300-3 w/ hard water bypass; 30x50 brine tank, 3/4" valve; 3/4" vacuum breaker; 3" SS NPT flow meter | 1 | Mechanical | site · manual | Culligan inv. 6489609 (5/27/26) | |
| Plumbing | Boiler / water heating | Navien | NFC-175 (from IFC) | per IFC | Mechanical | site | IFC only (plumbing in IFC is not as built) ASSUMED | |
| HVAC | DOAS units | Alpha Aire (by AllTrade Heating and Air) | Alpha Aire II DOAS, VAV air-source heat pump w/ energy recovery, 8 ton | 3 | Mechanical + home locker room | manual | AllTrades DOAS invoice; Reed emails 8/17 + 9/8/26 | |
| HVAC | Other HVAC | Trane / Greenheck (IFC) | Trane 5 ton; Greenheck IDBH | per IFC | IFC families ASSUMED | |||
| HVAC | Dryer exhaust upgrade (proposed) | Dryer supplier (name not on file) | Industrial lint trap 8" to 12" + 1.5 HP inline blower | 1 | Laundry | Reed "Martinsville Dryer" 10/20/26 Pending approval | ||
| Electrical | Exterior LED wall packs | By AllTrade Heating and Air | LED wall packs (5 added: 2 south, 3 north) + emergency lighting at exits | 5+ | Exterior | Reed emails 8/27 + 10/1/26 Fixture model not on file | ||
| FF&E | Locker room clocks | Nevco | Locker room clocks (installer Andy) | 4 | Both locker rooms, coach office, officials | site | Nevco Locker Room Clocks thread 7/29-8/24/26 Model ASSUMED | |
| FF&E | TVs | Not on file | 60" flat screen wall mount (IFC); locker TVs mirror one PC | per IFC | Locker rooms, coaches room | IFC; Will Miers 8/31/26 ASSUMED | ||
| FF&E | Ice machine | Manitowoc | iP0450 half-dice/dice cube machine (IDP0450A ASSUMED) | 1 | Training 132 | site · manual | Ice Machine Specs - 132 Training ASSUMED | |
| FF&E | Reach-in refrigerator | Everest Refrigeration (ASSUMED brand) | EGSDH2 glass/solid half-door dual temp | Stainless | 1 | Training 132 | manual | Refrigerator Specs - 132 Training ASSUMED |
| FF&E | Wall graphics | DG Graphics (Martinsville) | Vinyl wall wrap + window perf on door glass | School colors | Hallway north of locker room, doors | DG Graphics thread 7/21-8/24/26 | ||
| FF&E | Washer / dryer | Not on file | Commercial washer + dryer | Laundry | Kyle 8/31/26 ASSUMED | |||
| FF&E | Benches (visitor locker) | Lee Company | Portable anchorless pedestal benches | Visitor locker room | Reed 9/14/26 Model ASSUMED | |||
| FF&E | Fire extinguishers + cabinets | Extinguisher Pro (owner) | Per Building C fire extinguisher plan | Per plan | Football Locker room thread 9/1/26 By owner | |||
| Site | Wrought iron fence + gates | Broyer Construction (installer) | Ornamental (wrought iron) fence, main gates | Black ASSUMED | Site perimeter | Reed emails 8/19, 9/8, 10/12/26 Manufacturer ASSUMED | ||
| Site | Chain link privacy fence | K W Fence (Earl Wagler) | Chain link around HVAC units + electrical service | Galvanized ASSUMED | HVAC + electrical | Reed "Fw: invoice" 10/20/26 | ||
| Site | Concrete parking curbs | Broyer Construction | Precast wheel stops, pinned, ~24" to center from walk (Kyle) | Concrete | all stalls | Parking | AFC Floors thread 10/8-10/15/26 Spacing ASSUMED | |
| Site | Artesian Well + mums | Broyer / landscape crew | Two-tier rock well, bucket + landscape pump; alternating red & yellow mums | Red / yellow | South lawn | Update from the AFC thread 9/2-9/8/26 |
| Item | Warrantor | Term | Start | Registration | Document |
|---|---|---|---|---|---|
| Building C work (general 1-yr correction) | GT Investments, LLC | 1 year correction period after Substantial Completion; all other warranties issued in Owner name | 2026-08-26 ASSUMED | n/a | AIA A104 Contract (Owner GM Development) §9.4, §18.2 |
| Metal roof panels | Graber Post Buildings (manufacturer) | 40 year (G-Rib 40 Yr 29 ga) | 2026-08 ASSUMED | Not on file - ask GPB | GPB contract #71682 |
| Wainscot / liner panels | Graber Post Buildings | 10 year (G10 10 Yr 29 ga) | 2026-08 ASSUMED | Not on file | GPB contract #71682 |
| GPB building workmanship | Graber Post Buildings, Inc. | Limited: correct deficiencies; claims within 1 year of Substantial Completion | 2026-08-26 ASSUMED | n/a | GPB contract #71682 §17, §28 |
| Access control, cameras, network | APTEK | 1 year hardware + labor from installation | Install date not on file | n/a | APTEK quotes #002421 / #002495 |
| Baby changing station | Koala Kare (if KB300) / ASI (installed 9012) | KB300: 5 year limited incl. vandalism; ASI 9012 term not on file | 2026-06/07 delivery ASSUMED | Not on file | Koala Kare KB300 spec sheet (installed unit is ASI 9012 - ASSUMED) |
| Water softener | Culligan | Manufacturer warranty - term not on file | 2026-05-27 ASSUMED | Not on file | Culligan inv. 6489609; Hi-Flo 3e IOM |
| DOAS units | Alpha Aire / AllTrade Heating and Air | Term not on file | Startup 2026-09 ASSUMED | Not on file | Ask AllTrades |
| MEP installation | AllTrade Heating and Air | Term not on file (assume 1 yr per prime contract) | 2026-08-26 ASSUMED | n/a | AllTrades proposal #101 (no warranty clause) |
| Epoxy flake floors | TAK Floor Coatings | Term not on file (sticky floor in officials RR under review 10/2026) | 2026-06-19 ASSUMED | n/a | TAK invoice #75 |
| Carpet tile | Milliken | Manufacturer warranty - term not on file | 2026-07-25 ASSUMED | Not on file | Wagler inv. 4419 |
| Flush valves | Sloan | Manufacturer warranty - term not on file | 2026-10 (replacement) ASSUMED | Not on file | Reed 10/5/26 |
| Signage | Sign manufacturer (spec) | 5 years from Substantial Completion (Div 10 spec) | 2026-08-26 ASSUMED | n/a | Building C Div 10 spec §1.6 (signs by owner/Sign Solutions - ASSUMED) |
| Masonry | L&L Masonry LLC | Term not on file (1 yr ASSUMED) | 2026-08 ASSUMED | n/a | No warranty language in L&L quote |
| Site work / fence / paving | Broyer Construction | Term not on file; fence "as provided by manufacturer" (Div 32) | 2026-10 ASSUMED | n/a | Building C Div 32 spec; Broyer contracts |
| Company | Trade | Contact |
|---|---|---|
| GT Investments, LLC (Brook / Reed Tarr) | General contractor | Reed Tarr, reed@dbtarr.com; Brook Tarr, brook@dbtarr.com; 812-278-0060 |
| D B Tarr and Company | Architect / plans | 8728 W Co Rd 175 S, French Lick IN; dbtarr@yahoo.com; 812-278-0060 |
| GM Development Companies LLC | Owner rep / developer (contract owner) | Greg Martz, greg@gm-development.com, 317-417-5094 |
| Graber Post Buildings, Inc. (GPB) | Building shell, metal roof/siding/trim, toilet partitions order | Darrell Wittmer, 812-636-7355, graberpost.com |
| L&L Masonry LLC | CMU walls, brick wainscot | Lamar Fox, LLMasonryllc@gmail.com, 317-512-8908 |
| AllTrade Heating and Air | Electrical, mechanical, plumbing, DOAS | Josh (sales); Jacque Kendle, admin@alltradeheatingandair.net, 812-789-3065 |
| Broyer Construction (Jack Broyer) | Site demo, utilities, concrete, asphalt, fence, landscaping, retention pond | Jack Broyer (contact details not in sources) |
| W & W Poured Walls, Inc. | Concrete cut + pour back (interior) | Sheldon Graber, sheldon@wwpouredwalls.com, 812-787-0180 |
| TAK Floor Coatings | Epoxy flake floors | sales@takcoatings.com, 317-300-5017 |
| Wagler Floor & Design | Carpet tile + cove base | Matt Wagler, Matt@waglerfloor.com, 812-257-0700 |
| Matthew Knepp | Block showers (softball locker room) | mattslk@upwardmail.com |
| K W Fence (Earl Wagler) | Chain link privacy fencing | kwfence1@gmail.com |
| K and K Fence Co | Temporary fence panels (supply) | Kevin Banholzer, kbanholzer@kandkfence.com, 317-759-5891 |
| Culligan Martinsville / Culligan Ultrapure | Water softener supply + install | Jason Alexander, 317-441-9242; 765-349-5351 |
| Stoll Bros. Lumber | Solid surface countertops (measure + install) | 812-636-4053 |
| Cabinets To Go (Indianapolis) | Cabinets | Timothy Casteel, 317-608-0165 |
| Indiana Door & Hardware Specialties | Door hardware | 812-336-0813 |
| CDF Distributors | HM doors, frames, mullions | cdfdistributors.com |
| Total Restroom | Toilet accessories supply | totalrestroom.com |
| Grabbars.com | Grab bars supply | grabbars.com |
| APTEK | Access control, cameras, networking (GM Development contract) | Damir Husejnovic, DamirH@aptek-ssc.com, 317-643-2726 |
| Galaxy One | Low voltage / fiber | James Meade, james.meade@galaxyone.us |
| Live Wire | Lower electrical box N of ticket booth | Contact not in sources |
| Miller Pipeline (for CenterPoint) | Lower 2" gas line, new gas service | Contact not in sources |
| DG Graphics | Wall graphics + window perf | Matt Long, matt@dggraphicsindy.com, 765-349-9500 |
| Nevco (installer Andy) | Locker room clocks | Contact not in sources |
| Hilario | Extra cleaning | Contact not in sources |
| Lee Company | Visitor locker room benches (per Reed 9/14/26) | Samantha Broach (billing), sbroach@leecompanyinc.com, 812-235-8155 |
| Extinguisher Pro | Fire extinguishers (owner contract) | Via Kyle Stout |
| Sign Solutions (Indianapolis) | Signage (owner) | Via Kyle Stout - ASSUMED |